Original Article

Appraisal of Optimum Economic Life for Farm Tractor: A Case Study

Year: 2019 | Month: March | Volume 64 | Issue 1

References (20)

Ajibade, A.D., Odusina, M.T., Rafiu, A.A., Ayarinde, A.W., Adeleke, B.S. & Babarinde, S.N. 2014. The use of replacement model to determine the appropriate time to replace a deteriorating industrial equipment. IOSR Journal of Mathematics, 10(2): 9–13

View at Google Scholar

Amiens, E.O., Oisamoje, M.D. & Inegbenebor, A.U. 2015. A dynamic programming approach to replacement of transport vehicles in Benin City, Nigeria. British Journal of Mathematics & Computer Science, 6(3): 204–214

View at Google Scholar

Anderson, A.W. 1988, Factors affecting machinery costs in grain production. ASAE paper No. 88-1057

View at Google Scholar

ASAE Standards EP496. Agricultural Machinery Management Engineering Practice. 2006.

View at Google Scholar

Aven, T. 1992. Reliability and Risk Analysis. Elsevier Science Publishers Ltd..

View at Google Scholar

Belchet, E.F. 2008. Afirst passage time problem in system replacement. Proceedings of the first international conference on applied operational research. Tabir Institute for Operational Research, System Design and Financial Services, 1: 222–229

View at Google Scholar

Bukhari, S.B., Baloch, J.M. & Naqvi, S.H. 1988. “Cost of operating tractors on Quetta farm, Pakistan”, AMA, 19(1): 14-19.

View at Google Scholar

Christer, A. & Goodbody, W. 1980. Equipment replacement in an unsteady economy. Journal of the Operational Research Society, 31(6): 497–506.

View at Google Scholar

Dauda, A. & Ashami, B. 2000. “Agricultural machinery utilization in Borno State”, Nigerian Journal of Engineering Management, 1(4): 23-7

View at Google Scholar

Dohi, T., Ashioka, A., Kaio, N. & Osaki, S. 2006. Statistical estimation algorithms for repairs-time limit replacement scheduling under earning criteria. Computers and Mathematics with Applications, 51: 345–356.

View at Google Scholar

Eilon, S., King, J. & Hutchinson, D. 1966. A study in equipment replacement. Operational Research Quarterly, 17(1): 59–71.

View at Google Scholar

Ekeocha, R.J.O., Odukwe, A.O. & Aguwambaa, U. J. C. 2011. Machinery replacement problems model. World Journal of Engineering and Pure and Applied Science, 1(3): 81.

View at Google Scholar

Hunt, D.R. 1974. Eight Years of Cost Monitoring, Working Paper No. 74-1544, ASAE, St Joseph,MI.

View at Google Scholar

Hunt, D.R. 1977. Farm Power and Machinery Management: Laboratory Manual and Workbook, 7th ed., Iowa State University Press, Ames, IA.

View at Google Scholar

Hunt, D.R. Farm Power and Machinery Management, Tenth Edition, Iowa State University Press, Ames. USA. 2001

View at Google Scholar

Igbeka, J.C. 1986. “Economic evaluation of tillage operations in some mechanized farms in Nigeria”, AMA, 17(2): 17-22

View at Google Scholar

Jin, D. & Kite-Powell, H.L. 2000. Optimal fleet utilization and replacement. Transportation Research Part E36, 3–20.

View at Google Scholar

Morris, J. 1998. Estimation of tractor repair and maintenance costs. Journal of Agricultural Engineering Research, 41(3): 191-200.

View at Google Scholar

Offiong, A., Akpan, W.A. & Ufot, E. 2013. Development of vehicle replacement programme for a road transport company. International Journal of Applied Science and Technology, 3(2): 31–35.

View at Google Scholar

Perry, G.M., Bayaner A. & Nixon C.J. 1990. The effect of usage and size on tractor depreciation. Am. J. Agr. Econ., 72(2): 317-325.

View at Google Scholar

Economic Affairs, Quarterly Journal of Economics| In Association with AESSRA

74618478 - Visitors since February 20, 2019